PENTA Learning Center is an evolving tool. Additional content is added as soon as it is available.
Drawing Status Codes
Overview:
In Project Administration you can define a status code when entering a Drawing record in PENTA to track the status of the Drawing. In the Drawing Status Codes window is where you can set up user define codes/description that are placed in 3 buckets: Closed, Open, and Cancelled.
Benefits:
Provides the flexibility to customize status codes to track Drawings
Provides the ability to track the status of Drawings
Roles:
Project Manager
Location:
Project Management > Setup > Project Administration > Drawing Status Codes
Video: