Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview:

In Project Administration you can define a status code when entering a drawing Drawing record in PENTA to track the drawingstatus of the Drawing.  In the Drawing Status Codes window is where you can setup set up user define codes/description that are placed in 3 buckets: Closed, Open, and Cancelled.

Benefits:

  • Provides the flexibility to customize status codes to track drawingsDrawings
  • Provides the ability to track the status of Drawings

Roles:

  • Project Manager

Location:

...