Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview:

In Project Administration you can define a status code when entering a Drawing record in PENTA to track the status of the Drawing.  In the Drawing Status Codes window is where you can set up user define codes/description that are placed in 3 buckets: Closed, Open, and Cancelled.

Benefits:

  • Provides the flexibility to customize status codes to track Drawings
  • Provides the ability to track the status of Drawings

Roles:

  • Project Manager

Location:

  • Project Management > Setup > Project Administration > Drawing Status Codes

Video:

Widget Connector
urlhttps://vimeo.com/manage/videos/309171110/082a3152d8