Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview:

In Project Administration you can define a status code when entering a drawing record in PENTA to track drawingsthe drawing.  In the Drawing Status Codes window is where you can setup user define codes/description that are placed in 3 buckets: Closed, Open, and Cancelled.

Benefits:

  • Provides the flexibility to customize status codes to track drawings

Roles:

  • Operations Lead

Location:

...